This Web page describes the assignment dealing with 1D modelling of the river Rhine section Ruhrort - Wesel.
Data PreAnalysis | GIS: river crossections, Excel, R: time series |
Model Setup Steady | Mike11 or HEC-RAS |
Model Setup Unsteady | low water/normal/flood situation/event |
Model Calibration | selected flood event |
Model Verification | other flood events |
Model Comparison | Mike11 to HEC-RAS results |
Assignment Report | individual an team/model part |
introduction, preparation case study | |
Mike11/HEC-RAS basic model | |
1D modelling and introduction 2D modelling (Telemac) | |
2D model Telemac | |
project finalization and documentation (paper, poster, presentation) |
The assignment report documents the applied river modelling activities step by step in a kind of protocol and personal discussions. The protocol should allow you and others to repeat the performed actions. The report can be done in an informal mode using keywords, lists and enumerations. Please add for each important working step a discussion of the work done including interpretation of results, new insights and experiences achived.